Supporting Sustainability: Star Power’s Full-Service Utility Support in an Area of Outstanding Natural Beauty

Project Overview

Star Power was appointed to deliver a complete temporary utility solution for several site welfare compounds located within an Area of Outstanding Natural Beauty in the Snowdonia region. The project required a reliable and environmentally considerate approach, with services including temporary power, water supply, and on-site support.

Due to the sensitive nature of the location and its remote positioning, the infrastructure had to be not only robust but also discreet and sustainable. From initial consultation through to full installation and maintenance, Star Power delivered a turnkey service designed to meet both practical requirements and strict environmental expectations.

Challenge

Working within an AONB introduced a series of challenges, most notably the need to balance operational functionality with environmental protection. The welfare compounds had to be fully serviced despite their remote setting, meaning all systems had to be dependable and designed to operate autonomously.

Additionally, Star Power was required to meet high standards of health and safety, as well as stringent quality benchmarks set by key stakeholders. Minimising downtime, managing cost efficiency, and reducing environmental impact were also key project objectives.

Solution

To meet the project brief, Star Power delivered a bespoke utility solution that addressed both short-term operational needs and long-term sustainability goals.

A rainwater harvesting system was designed and installed beneath the main temporary office complex. This included three interlinked 3,000-litre plastic tanks, connected to a filtered water pumping unit. The system was integrated into the existing plumbing infrastructure, enabling all toilet facilities within the cabins to be flushed using harvested rainwater. This significantly reduced the site’s reliance on mains water and contributed to the project’s environmental objectives.

For power provision, the site was initially supported by a 250kVA Stage V diesel generator, providing a stable and compliant energy source from the outset. Over 500 metres of armoured single-core cable was installed through underground ducting to connect the generator to the main distribution panel within the welfare compound.

Several months into the project, the client requested a transition from temporary generation to mains power. The new supply point was located on the opposite side of the compound, requiring careful planning to avoid disruption. Star Power successfully managed the transition, reusing as much of the existing cabling infrastructure as possible to minimise both waste and additional costs. The upgrade was delivered without impacting the site’s day-to-day operations.

Outcome

The successful delivery of this project demonstrated Star Power’s ability to provide intelligent, environmentally responsible utility solutions, even in the most sensitive and logistically challenging environments. From water conservation to power continuity, the team ensured every element was delivered safely, efficiently, and in line with client expectations.

Benefits of the Solution

  • Environmental Responsibility: The rainwater harvesting system supported the project’s sustainability goals, reducing reliance on external water sources.
  • Operational Continuity: The transition from temporary to permanent power was delivered with no unplanned downtime, maintaining full site operations throughout.
  • Cost and Waste Reduction: By reusing pre-installed materials during the mains upgrade, Star Power limited waste and controlled additional project costs.
  • Compliance and Quality: All work met high standards of safety, quality, and professional conduct.

 

Setting up Snowdon

Star Power’s Full-Service Utility Support in an Area of Outstanding Natural Beauty

Star Power Marketing
Back to top